(How Shwe Sakar Co. Ltd. managed to overcome bottlenecks in production capacity)
Regular maintenance of machinery and equipment at Shwe Sakar was practically non-existant. Unused sewing machines were stored in the production area and partly in a separate storage room. None of these unused machines were covered to protect them from dirt and dust; nor were they serviced or repaired.
In case of a sudden machine break down in the sewing lines or an unexpected requirement to increase the production capacity, stored machines needed to be cleaned and adjusted first to make them ready for production. This hampered the production flow and led to bottlenecks and, in the worst case, stopped the entire production.
Read More: Artikel Shwe Sakar